The Federal Energy Regulatory Commission (FERC) has issued a Notice of Proposed Rulemaking (NOPR) to revise its pro forma Small Generator Interconnection Agreement (SGIA). The new rule would require small generators (those that are 20 MW or less) to “ride through” through or to stay connected to and synchronized with the transmission system during a system disturbance.
Continue Reading